YACHT CHANGE ORDER | PRINCESS V78 (2010)
BUILDER : | PRINCESS YACHTS |
---|---|
MODEL : | PRINCESS V78 |
LENGHT | BEAM : | 78.0 feet (23,77 m) | 18.5 feet (5,64 m) |
YEAR | REFIT : | 2010 |
MATERIALS : | GRP |
GROSS TONNAGE : | |
CREW : | 2 |
ENGINE : | 2 x CATERPILLAR C32 ACERT 1800 HP |
SPEED (Cruise / Max) : | 34 / 39 Knots |
OPTIMISE YOUR INSURANCE | ASK FOR A QUOTE
YACHT CHANGE ORDER DESCRIPTION
Motor Yacht CHANGE ORDER is a PRINCESS V78 model built in 2010 by british ship builder PRINCESS YACHTS. M/Y CHANGE ORDER has a Hull and Superstructure built with fibreglass. She has a length of 78 feet, (23,8 meters) for a beam of 18,5 feet, (5,6 meters) and a draft of 5,5 feet, (1,7 meters). She can welcome up to two guests and employed up to two crew. M/Y CHANGE ORDER is powered by two CATERPILLAR C32 ACERT engines developing up to 3600 horse power for a cruising speed of 34 knots and can reach a max speed of 39 knots.
ABOUT M/Y CHANGE ORDER INSURANCE
The maximum speed of yacht CHANGE ORDER might incur additional conditions and an increased Premium and Deductible regarding the underwritter. We will offer you an insurance package to suit your specific needs.
Annual Premium.
Premiums displayed excluding Flag Tax & Fees if required.
Premiums and conditions are based on yacht model or equivalent in our portfolio and depend on the build year, use and operational home port.
Bespoke conditions, Premium and deductible on request.
P&I compliant with MLC2006 including crew welfare & Personal accident. P&I premiums related to our Hull & Machinery Policies/
Non-Contractual Premiums